{"id":329,"date":"2022-07-28T18:13:36","date_gmt":"2022-07-28T18:13:36","guid":{"rendered":"http:\/\/bechele.de\/?p=329"},"modified":"2022-09-23T13:36:10","modified_gmt":"2022-09-23T13:36:10","slug":"build-instruchtion-part-2","status":"publish","type":"page","link":"https:\/\/bechele.de\/?page_id=329","title":{"rendered":"Build instruction part 2"},"content":{"rendered":"\n<p>here Part 2 of the ESP-12-in-circuit-adapter build:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Fixing the conntact wires in the rubber pad<\/li><li>Inserting the module to determine the distances<\/li><li>Fixing the contact wires with hot glue<\/li><li>Fixing the contact wires on the pin header side<\/li><li>Fixing the angle pin header<\/li><li>Glueing on the keys<\/li><\/ol>\n\n\n\n<p>Part 3:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Soldering in the circuit wires<\/li><li>Soldering in the pin headers<\/li><li>Finalizing and test<\/li><\/ol>\n\n\n\n<p>1. Fixing the contact wires in the rubber pad<\/p>\n\n\n\n<p>Hold the contacts with small, strong compressorium pliers at the short end and push it into the first hole of the pre pinned rubber pad, so that the tip just juts out of the rubber and the long end goes through the correct hole in the bread board:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-1.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Continue with all further contacts the same way until all contacts are located in the desired position. Now adjust the height of all contacts. Slightly bent contacts need to be rectified accordingly.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-2.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-3.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>2. Inserting the module to determine the distances<\/p>\n\n\n\n<p>Insert now the ESP-12 Module and move the contact wires carefully into the groves :<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-4.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>3. Fixing the contacts with hot glue<\/p>\n\n\n\n<p>Fix the bending points with hot glue &#8211; see images:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-5.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-6.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>4. Fixing the contact wires on the pin header side.&nbsp;<\/p>\n\n\n\n<p>Shorten the contact wires extending the base boardand bend them around the link to the neigbouring hole. Push the wire a little against the module so a slight contact pressure remains after fixing against the module:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-7.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>5. Fixing the angle pin header<\/p>\n\n\n\n<p>Fix the 8-pin (or 2&#215;4) Angle pin header onto the upper side with hot glue.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-8.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>6. Glueing on the keys<\/p>\n\n\n\n<p>Glue on the keys on the upper side as hown in the picture with a little witch glue:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-9.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/bechele.de\/wp-content\/uploads\/2022\/07\/62-10.jpg\" alt=\"\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>here Part 2 of the ESP-12-in-circuit-adapter build: Fixing the conntact wires in the rubber pad Inserting the module to determine the distances Fixing the contact&hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":300,"menu_order":3,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-329","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/pages\/329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bechele.de\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=329"}],"version-history":[{"count":12,"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/pages\/329\/revisions"}],"predecessor-version":[{"id":366,"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/pages\/329\/revisions\/366"}],"up":[{"embeddable":true,"href":"https:\/\/bechele.de\/index.php?rest_route=\/wp\/v2\/pages\/300"}],"wp:attachment":[{"href":"https:\/\/bechele.de\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}